Lifetime Impact 44” Portable Basketball Hoop

  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getAggregateRating, 101ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;
Price Pending
???FI_HOVER_OVER_IMAGE_TO_ZOOM???

PROTECTION PLAN

(optional)Info
Lifetime Impact 44” Portable Basketball Hoop
Lifetime Impact 44” Portable Basketball Hoop
Add to Cart
Please choose product options above
Check Store Availability
Please choose product options above
PDP Sticky bottom AddToCart Section - active and hide position
This product is currently out of stock.
ScoreCard

Get 3% back with ScoreCard!  300 Points = $10 Reward. Learn More

Info

Product Information:

Host backyard games with the Lifetime 44” Portable Basketball System. Featuring the Impact® high density backboard with fade-resistant, all-weather graphics and a classic orange rim, the portable goal is built for long-term use. A telescoping pole offers height adjustment in 6 inch increments between 7.5 and 10 feet, while a portable roller base allows easy relocation. Installation is simple and a 5 Year Limited Factory Warranty is included.

Click here to learn more about the on-site assembly service offered for this hoop.

FEATURES:

  • Portable basketball system
  • 44” Impact® Backboard is high-density UV-protected Polyethelene Plastic with fade-resistant, all-weather graphics
  • Blow-molded frame pad
  • 18” Orange Classic Rim with all-weather net
  • Three piece, 2.75” round powder-coated steel telescoping pole adjusts from 7.5’ – 10’
  • Pro Court portable roller base – 27 gal. (102.2 liters)
  • Proudly assembled in the USA
  • Manufacturer’s 5 Year Limited Factory Warranty
  • Model: 90040

For additional information relating to the Manufacturer's Warranty, please contact 1-800-242-3865.
  • Brand: Lifetime
  • Country of Origin: Imported

Web ID: 16LIFU44MPCTPRTBLBKE

  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getReviews, 0ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;