Product View
Lifetime Impact 44” Portable Basketball Hoop
Shipping Information
How are we doing?Give Us Feedback On This Page.
Product Information
Host backyard games with the Lifetime 44” Portable Basketball System. Featuring the Impact® high density backboard with fade-resistant, all-weather graphics and a classic orange rim, the portable goal is built for long-term use. A telescoping pole offers height adjustment in 6 inch increments between 7.5 and 10 feet, while a portable roller base allows easy relocation. Installation is simple and a 5 Year Limited Factory Warranty is included.
FEATURES:
- Portable basketball system
- 44” Impact® Backboard is high-density UV-protected Polyethelene Plastic with fade-resistant, all-weather graphics
- Blow-molded frame pad
- 18” Orange Classic Rim with all-weather net
- Three piece, 2.75” round powder-coated steel telescoping pole adjusts from 7.5’ – 10’
- Pro Court portable roller base – 27 gal. (102.2 liters)
- Manufacturer’s 5 Year Limited Factory Warranty
- Made in the USA from US and Imported Parts
- Model: 90040
Assembly Info
- Fill Base with 27 gallons of water
- Base gel available to prevent freezing (sold separately)
- Sand can also be used
Turn your water into gel to protect against freezing during the winter with Base Hold Gel
- Brand : Lifetime
- Country of Origin : United States of America or Imported
- Style : 90040z
- DSG Pro Tips
- Web ID: 16LIFU44MPCTPRTBLBKE
- SKU: 14070611