Lifetime Impact 44” Portable Basketball Hoop

???FI_HOVER_OVER_IMAGE_TO_ZOOM???
Lifetime Impact 44” Portable Basketball Hoop is rated 4.8 out of 5 by 9.
  • y_2018, m_5, d_22, h_11
  • bvseo_bulk, prod_bvrr, vn_bulk_2.0.8
  • cp_1, bvpage1
  • co_hasreviews, tv_0, tr_9
  • loc_en_US, sid_16LIFU44MPCTPRTBLBKE, prod, sort_[SortEntry(order=SUBMISSION_TIME, direction=DESCENDING)]
  • clientName_dsg
NOW:$114.99(36% off!)
WAS: $179.99*

PROTECTION PLAN

(optional)Info
:


Lifetime Impact 44” Portable Basketball Hoop
Lifetime Impact 44” Portable Basketball Hoop
Selected Option Not Available to Ship
Selected Option Not Available For Pickup
PDP Sticky bottom AddToCart Section - active and hide position
This product is currently out of stock.
Please choose product options above
Please choose product options above
Info

Product Information:

Host backyard games with the Lifetime 44” Portable Basketball System. Featuring the Impact® high density backboard with fade-resistant, all-weather graphics and a classic orange rim, the portable goal is built for long-term use. A telescoping pole offers height adjustment in 6 inch increments between 7.5 and 10 feet, while a portable roller base allows easy relocation. Installation is simple and a 5 Year Limited Factory Warranty is included.

Click here to learn more about the on-site assembly service offered for this hoop.

FEATURES:

  • Portable basketball system
  • 44” Impact® Backboard is high-density UV-protected Polyethelene Plastic with fade-resistant, all-weather graphics
  • Blow-molded frame pad
  • 18” Orange Classic Rim with all-weather net
  • Three piece, 2.75” round powder-coated steel telescoping pole adjusts from 7.5’ – 10’
  • Pro Court portable roller base – 27 gal. (102.2 liters)
  • Proudly assembled in the USA
  • Manufacturer’s 5 Year Limited Factory Warranty
  • Model: 90040

For additional information relating to the Manufacturer's Warranty, please contact 1-800-242-3865.
  • Brand: Lifetime
  • Country of Origin: Imported

Web ID: 16LIFU44MPCTPRTBLBKE

Rated 4 out of 5 by from Overall good features for the price point Bought this for my grandchildren visit. Ages 5 thru 15. Was a great success.
Date published: 2018-04-18
Rated 5 out of 5 by from Everything I wanted Got this for the grandson (8 yr). Great instructions to assemble. Needed very little help (got some from my grandson too). Somehow I misplaced the base plugs so I called Lifetime customer service and they shipped them out no charge. Grandson couldnt be happier. The size of the backboard will last him a few more years and then he will probably need one a bit bigger. I think it will just make him be more accurate.
Date published: 2018-01-23
Rated 5 out of 5 by from Excellent Customer Service I was missing a few small parts after I moved houses. I contacted customer service and Kyle shipped me the parts at no charge. Randy is ever helpful on the online chat as well. Way to go Lifetime!
Date published: 2017-11-13
Rated 5 out of 5 by from Great fun! I bought this basketball hoop a few years ago, and my kids love it. It's been out year-round, in all types of weather and it's held up perfectly. Highly recommended!
Date published: 2017-08-08
Rated 5 out of 5 by from hoops in wisconsin north woods purchased for our grandson. love that we can adjust. easy to put together
Date published: 2017-07-20
Rated 5 out of 5 by from Replacement basketball hoop base Tasha was awesome, she was very helpful and had my replacement part shipped to me quickly. Customer service experience was awesome, definitely will buy another basketball hoop from lifetime when my youngest son is ready.
Date published: 2017-06-30
Rated 5 out of 5 by from The BEST Customer Service The lady I spoke with was wonderful! It is so hard to find good customer service these days. She really valued me as a customer and made the situation a positive experience. I will rave about this company to everyone.
Date published: 2017-04-05
Rated 4 out of 5 by from Instructions nightmare! Instructions should be listed by size and thread. There should be a single page exploded view of product identifying all individual parts.
Date published: 2016-02-22
  • y_2018, m_5, d_22, h_11
  • bvseo_bulk, prod_bvrr, vn_bulk_2.0.8
  • cp_1, bvpage1
  • co_hasreviews, tv_0, tr_9
  • loc_en_US, sid_16LIFU44MPCTPRTBLBKE, prod, sort_[SortEntry(order=SUBMISSION_TIME, direction=DESCENDING)]
  • clientName_dsg